OUR PROJECTS

Helping Shape the Roads, Schools, and Communities Where You Live. 

turnpike-otic-39-25-01.jpg

TRANSPORTATION

OTIC 39-25-01 Mainline Pavement Reconstruction

Ohio Turnpike and Infrastructure Commission | 2025–present

QA testing and engineering support on the full-depth reconstruction of 5.7 miles of Turnpike mainline, MP 154–160.

irishtown-bend-river.jpg

TRANSPORTATION

Irishtown Bend Stabilization and Rehabilitation

Cleveland-Cuyahoga County Port Authority / Tri Mor Corporation | 2025–2026

Construction materials testing for the new bulkhead wall and Franklin Avenue rebuild above the Cuyahoga River.

norfolk-southern-amherst.jpg

TRANSPORTATION

Norfolk Southern Rail Bridge over S. Main Street, Amherst

The Ruhlin Company | 2026

Four borings to about 76 feet confirming bedrock for the drilled shaft foundations, with the report issued two days after drilling.

hopkins-gate-c28-concourse.jpg

AVIATION

Cleveland Hopkins – Initial Programming Study

DVA Architecture | 2025
Five structural borings to 130–170 feet for the airport's future terminal program, with foundation design values for loads up to 3,000 kips.

hopkins-terminal-frontier.jpg

AVIATION

Cleveland Hopkins – Passenger Boarding Bridge Replacement

Aero Systems Engineering | 2026
Six borings to 50–60 feet through the apron slab at eight gates, coordinated around active gate operations.

erie-ottawa-runway-9-27.jpg

AVIATION

Runway 9-27 Rehabilitation and Taxiway C Reconstruction

Erie-Ottawa International Airport / C&S Companies | 2025–2026
Subsurface exploration for design, then FAA P-401 asphalt acceptance testing during construction, with lots evaluated by percent within limits.

hopkins-control-tower.jpg

AVIATION

Cleveland Hopkins – O&M General Engineering Services

City of Cleveland, Dept. of Port Control / R.L. Bowen & Associates | 2025–present
On-call construction materials testing and special inspections for maintenance and repair work across the airfield and terminal.

cuyahoga-falls-6-12.jpg

SCHOOLS & PUBLIC BUILDINGS

Cuyahoga Falls 6–12 Campus

Cuyahoga Falls City School District / Hammond Construction | 2022–2025
Testing and special inspections for a new 365,000 sq ft middle and high school, with reports out within 24 hours and no schedule delays attributed to testing.

bedford-high-school.jpg

SCHOOLS & PUBLIC BUILDINGS

Bedford City Schools – New PK-2, 6-8 and 9-12 Schools

Bedford City School District / GPD Group | 2025–present
Testing on the new PK-2 and 6-8 buildings, and 36 borings around the occupied campus for the new 9-12 school.

riverside-high-school.jpg

SCHOOLS & PUBLIC BUILDINGS

Riverside Local Schools – Riverview, Riverside High and Buckeye

Riverside Local School District, Painesville Township | 2025–2026
Subsurface explorations and foundation recommendations for three projects, then construction testing and inspection on the same sites.

cleveland-fire-station-26.jpg

SCHOOLS & PUBLIC BUILDINGS

Fire Stations Across Northeast Ohio

Municipal and township fire departments | 2025–2026
Geotechnical explorations and construction testing on nine stations, including Warrensville Heights, Avon, Strongsville, Bay Village and Medina.

Photo credits: Cleveland Hopkins Gate C28 by Kevin Payravi (CC BY-SA 4.0); Hopkins terminal by Reina Findley (CC BY 4.0); Irishtown Bend and Cleveland Fire Station 26 by Tim Evanson (CC BY-SA 2.0); Bedford and Riverside High Schools by SilentMatt Psychedelic (CC BY-SA 4.0); Hopkins control tower by Foxtod (CC0). All via Wikimedia Commons. Erie-Ottawa aerial: USDA NAIP imagery via USGS (public domain).